Skip to content
RAA-PERMIT-BOOST home Boosting Renewable Energy Acceleration Implementation
  • About
  • Partners
  • RAA map
  • Library
  • Support and FAQ
  • Contact

Renewable Acceleration Areas, from designation to delivery

RAA-PERMIT-BOOST helps public authorities, grid operators, project developers, NGOs and local communities in all 27 EU Member States to designate and run Renewable Acceleration Areas under Article 15 of the revised Renewable Energy Directive (RED III), while strengthening public acceptance and safeguarding biodiversity.

Explore the RAA map Get support

Project at a glance

Programme
EU LIFE, Clean Energy Transition
Duration
27 months, June 2026 to August 2028
Scope
All 27 EU Member States at national level; regional level for selected Member States
Consortium
10 partners, coordinated by Th!nk E (Belgium)

How the project works

Four steps that build on each other, from understanding where Member States stand to making the results last beyond 2028.

  1. 1

    Map

    We monitor how RAAs and permitting are implemented in all 27 Member States at national level, and at regional level in selected Member States.

  2. 2

    Learn

    In-depth case studies and two Communities of Practice let authorities and practitioners learn from each other.

  3. 3

    Apply

    Practical tools, a helpdesk with clinics, technical assistance and a self-assessment tool help overcome bottlenecks.

  4. 4

    Disseminate

    Policy input and a European Centre of Excellence keep the results available and in use after the project ends.

Where to start

Public authorities

The Clerk’s Manual, helpdesk clinics, technical assistance and a self-assessment tool support you in designating RAAs and speeding up permits.

Support for authorities

NGOs and civil society

The NGO KPI toolkit helps you monitor biodiversity safeguards, ecological integrity and public acceptance in RAAs.

Tools in the library

Developers and grid operators

See how each Member State designates RAAs and which European rules shape permitting.

RAA map and legal map

Citizens and communities

What are Renewable Acceleration Areas, why do they matter for climate goals and how is nature protected? Plain answers.

FAQ for everyone

Coming up

Planned milestones and events. Dates follow the project work plan and are updated as results are published.

  1. December 2026Launch of the Community of RAA Permitting and Implementation
  2. January 2027Clerk’s Manual for efficient permitting
  3. February 2027Call for targeted technical assistance opens on this website
  4. March 2027Helpdesk and permitting clinics go live; list of RAA pioneers and learners
  5. May 202725 to 30 case studies on RAA zoning and permitting
  6. 2027First EU policy conference – date to be announced
  7. November 2027First episodes of the RAA-PERMIT-BOOST podcast

About the project

RAA-PERMIT-BOOST is a 27-month EU LIFE project. It equips national and regional authorities, private companies and NGOs to plan and permit Renewable Acceleration Areas (RAAs), and helps civil society to better understand and accept renewable energy projects in these areas.

What are RAA and why they matter

What Renewable Acceleration Areas are

Renewable Acceleration Areas (RAAs) are areas on land, at sea or in inland waters that a Member State designates in a plan as particularly suitable for one or more types of renewable energy, such as solar or wind. They were introduced by the revised Renewable Energy Directive (RED III, Directive (EU) 2023/2413).

Areas are only designated where projects are not expected to have significant environmental impacts. Priority goes to artificial and built surfaces such as rooftops, car parks, transport infrastructure, industrial sites and degraded land. Natura 2000 sites, other nature protection areas and major bird and marine mammal migration routes are generally excluded. Each plan undergoes a strategic environmental assessment with public participation and sets mitigation rules that projects in the area must follow.

Member States had to map the areas they need for their national 2030 renewables contribution by 21 May 2025 (Article 15b) and to adopt plans designating Renewable Acceleration Areas by 21 February 2026 (Article 15c).

Why they matter for the expansion of renewables

The EU has committed to at least 42.5% renewable energy by 2030, with the aim of reaching 45%. That means building wind and solar capacity much faster than in the past. Long and complex permitting is one of the main bottlenecks: projects often wait years for approval, and environmental questions are examined again for every single project.

Renewable Acceleration Areas change this sequence. Key environmental questions are settled once, for the whole area, at planning stage. Inside a designated area, permit-granting has binding maximum durations of 12 months for onshore and 24 months for offshore projects, and projects that follow the plan’s mitigation rules go through a screening instead of a full environmental impact assessment.

The benefits go beyond speed. Developers and investors gain predictability about where projects are welcome. Authorities can focus their resources. Grid operators can plan connections in advance. Steering projects to suitable sites early, with public participation and clear exclusions for sensitive nature, reduces conflicts and builds the local acceptance that renewables need.

Where RAA-PERMIT-BOOST comes in

Designation alone does not deliver projects. Authorities need clear procedures, trained staff and data; communities and NGOs need to trust that biodiversity is safeguarded. RAA-PERMIT-BOOST works on both sides of that equation, across national and regional administrations.

The project partners share best practices between Member States and regions, identify the bottlenecks that slow down designation and permitting today, and develop practical solutions that make it easier to apply Renewable Acceleration Areas.

What the project delivers

RAA living repository
A stock-take of how all 27 Member States implement RED III Article 15, covering spatial planning, siting and permitting, at national level and for selected regions. Shown on the RAA map.
Pioneers and learners
Based on the EU-27 analysis, a list of which Member States lead on which RAA topics and who can learn from whom. See the library.
Case studies and comparative analysis
25 to 30 in-depth case studies on zoning and permitting, and what they show across countries and technologies.
The Clerk’s Manual
A step-by-step handbook for municipal clerks, planners and permitting officers responsible for RAA designation.
Helpdesk, clinics and technical assistance
Direct support, advisory services and clinics on legal, environmental and administrative bottlenecks. See Support and FAQ.
RAA self-assessment tool
A diagnostic for regional and national administrations to check their readiness and compliance with RED III.
NGO KPI toolkit
An evaluation framework for civil society to monitor biodiversity safeguards, ecological integrity and public acceptance in RAAs.
Technical handbook
Methods for spatial mapping, siting and RAA designation, validated in the Communities of Practice.
Policy recommendations
Evidence-based insights that advise policy makers on scaling and improving RAAs under Article 15.
European Centre of Excellence
Tools and community activities move to a permanent European platform so they stay in use after the project ends.

Communities of Practice

Two standing networks for peer exchange between authorities and practitioners.

Community of RAA Siting and Designation

Led by The Nature Conservancy

Siting technicians and GIS experts working on RED III Articles 15b and 15c exchange methods and good practice in regular online and in-person workshops.

Community of RAA Permitting and Implementation

Led by Ecorys, starting December 2026

Policy makers and permitting authorities build capacity together and learn from each other on approving and delivering projects inside designated RAAs.

Ask about joining a community

Key facts

Project leaflet (PDF, 260 KB)

Grant agreement
No 101294471 (LIFE25-CET-RAA-PERMIT-BOOST)
Call
LIFE-2025-CET-POLICY
Duration
1 June 2026 to 31 August 2028
Total eligible budget
€2,098,695.86
EU funding
€1,993,761.08 (95%)
Coordinator
Th!nk E, Belgium

Project results stay available on this website for at least two years after the project ends and are then maintained through the European Centre of Excellence and ICLEI Europe.

Partners

Ten organisations from five countries combine energy policy, legal analysis, spatial planning, nature conservation and local government expertise.

  • Th!nk E logo

    Th!nk E

    Belgium

    Project coordinator

    Role in the project: Project coordinator: steers the consortium and the exchange with the European Commission, and leads targeted technical assistance, the RAA self-assessment tool and the NGO KPI toolkit.

    Visit Th!nk E

    Th!nk E is an independent Belgian consultancy dedicated to accelerating a fair, resilient and affordable energy transition. From its base in Leuven, a multidisciplinary team supports public authorities, industry and the European institutions with evidence-based analysis, policy advice and hands-on project coordination.

    Read more about Th!nk E

    Th!nk E combines technical expertise in renewable energy, energy communities, hydrogen and the built environment with a strong grasp of governance, spatial planning, permitting and stakeholder engagement. The company coordinates and contributes to numerous EU-funded projects across the LIFE and Horizon Europe programmes, translating complex regulatory requirements into workable solutions on the ground.

    Renewables Acceleration Areas are where Europe’s climate ambitions meet the reality of the ground. Getting permitting and site designation right is what turns targets into installed capacity, and doing it with communities rather than against them is what makes it last.

    Jan Bormans, Th!nk E
  • Austrian Energy Agency logo

    Austrian Energy Agency (AEA)

    Austria

    Role in the project: Leads implementation support: the Clerk’s Manual, helpdesk and clinics, webinars, the FAQs and the podcast series.

    Visit Austrian Energy Agency

    The Austrian Energy Agency provides reliable answers for a secure, clean and affordable energy future. More than 100 experts from a wide range of disciplines provide science-based advice to decision-makers in government, business, public administration and international organisations. They support these stakeholders in restructuring the energy system and implementing measures for a successful energy transition and industrial transformation.

    Read more about Austrian Energy Agency

    The Austrian Energy Agency also implements the climate protection initiative klimaaktiv on behalf of the federal government and coordinates numerous EU-funded projects.

    The federal government, all federal states, major companies in the energy and transport sectors, interest groups and scientific organisations are members of the agency, and have been since 1977.

    Efficient permitting is a powerful driver in securing Europe’s energy transition.

    Benedikt Jaros, Austrian Energy Agency
  • eclareon logo

    eclareon

    Germany

    Role in the project: Leads the EU-27 analysis: the living repository, country fiches, pioneers and learners, and the final report.

    Visit eclareon

    eclareon provides strategic consultancy for the international deployment of sustainable energy and environmental technologies. Powered by a multilingual team and specialist network across EU Member States and beyond, eclareon combines investment market expertise with a holistic approach.

    Read more about eclareon

    By monitoring regulatory frameworks and analysing socio-economic impacts, its experts deliver actionable insights to EU policymakers, national governments and NGOs. The firm supports these stakeholders in streamlining permitting, removing administrative barriers, and modelling credit lines and legislation to accelerate the expansion of renewable energy, energy efficiency and green hydrogen. With the European Commission as one of its main clients, eclareon has been advancing energy and climate solutions for over 25 years.

    Faster permitting and fair spatial siting build the public trust needed to power Europe.

    Boris Valach, eclareon
  • Ecorys España logo

    Ecorys España

    Spain

    Role in the project: Leads the case studies on RAA zoning and permitting and the comparative analysis.

    Visit Ecorys España

    Ecorys is one of Europe’s leading public policy consultancies, supporting EU institutions and Member States in the design and implementation of policies that accelerate the clean energy transition. Ecorys has built a strong track record in renewable energy deployment, with particular expertise in permitting reform, Renewable Acceleration Areas (RAAs), spatial planning, public participation, citizen energy, energy communities and the governance of energy transitions.

    Read more about Ecorys España

    Through major European initiatives, including RE-Siting, the Citizen Energy Advisory Hub (CEAH) for the European Commission, and multiple technical assistance and capacity-building programmes for national and regional authorities, Ecorys has helped bridge the gap between policy ambition and practical implementation. Ecorys recently produced for the European Commission a study on good practices in siting renewable energy installations, taking into account the interactions with other public goods.

    Its multidisciplinary teams combine energy policy, environmental assessment, regional development, stakeholder engagement and socio-economic analysis to support authorities in delivering renewable energy projects more efficiently while maintaining high standards of transparency, environmental stewardship, community acceptance and local ownership. Drawing on extensive experience in renewable energy communities, policy research, citizen engagement and technical assistance, including through the European Energy Communities Facility (EECF) and the Rural Energy Community Advisory Hub (RECAH), Ecorys helps ensure that renewable energy deployment not only delivers on climate and energy objectives but also generates tangible benefits for citizens and local communities.

  • EREF logo

    European Renewable Energies Federation (EREF)

    Belgium

    Role in the project: Leads communication and dissemination, the EU policy conferences and the policy recommendations.

    Visit EREF

    The European Renewable Energies Federation (EREF) is the umbrella organisation representing national renewable energy associations and independent renewable energy producers, with a specific focus on SMEs.

    Read more about EREF

    For more than 27 years, EREF has been the voice for market access of independent producers from all renewable sources and all technologies to the internal energy market. EREF constantly monitors and accompanies EU legislation, surveys its transposition into national legislation, screens state aid decisions for non-renewable sources and calls for a fair handling of state aid in the energy sector. EREF always calls for ambitious targets for all renewable energies and efficiency and a reliable ETS mechanism.

    Siting and permitting are uppermost in the minds of EREF members, many of whom experience severe delays and regulatory challenges. They are keen to see the outcomes and recommendations of RAA-PERMIT-BOOST on how to accelerate renewables deployment.

  • EUFORES logo

    EUFORES

    Belgium

    Role in the project: Organises national parliamentary workshops and a briefing workshop for European stakeholders.

    Visit EUFORES

    The European Forum for Renewable Energy Sources (EUFORES) is a cross-party European network of Members of the European, national and regional parliaments committed to renewable energy and energy efficiency.

    Read more about EUFORES

    Founded in 1995 as an independent cross-party parliamentary network and based at the Renewable Energy House in Brussels, EUFORES connects parliamentarians at European and national level across the EU27, and with industry, scientific institutes, energy agencies and NGOs. Through formats such as its annual Inter-Parliamentary Meeting, it brings legislators and experts together to exchange knowledge and shape effective policy frameworks.

    EUFORES also coordinates and contributes to EU-funded projects, so that research findings reach decision-makers and become practical legislation, from national implementation to European agenda-setting.

  • The Nature Conservancy logo

    The Nature Conservancy in Europe (TNC)

    Germany

    Role in the project: Leads the Communities of Practice and the technical handbook for RAA siting and designation.

    Visit The Nature Conservancy

    The Nature Conservancy is a global conservation organisation dedicated to conserving the lands and waters on which all life depends. Guided by science, it creates innovative, on-the-ground solutions to the world’s toughest challenges so that nature and people can thrive together.

    Read more about The Nature Conservancy

    TNC is tackling climate change, conserving lands, waters and oceans at an unprecedented scale, providing food and water sustainably and helping make cities more resilient. It works to make a lasting difference in 83 countries and territories. In Europe, TNC collaborates with communities, NGOs, industry and policymakers to provide best practices for the global roll-out of renewables through science-led and participative methodologies, safeguarding biodiversity, social value and equity, and leveraging its partnerships with the private sector.

    Bringing together some of Europe’s most knowledgeable experts on renewable energy siting and permitting, RAA Permit Boost project will help to accelerate renewables by untangling the permitting question. We are excited about working together with our partners and the members of the Renewables Siting Community of Practice to mainstream early and participatory planning across the European countries to make sure renewables deployment accelerates by having people and nature on board.

    Elif Gündüzyeli, The Nature Conservancy
  • Ecorys Brussels logo

    Ecorys Brussels

    Belgium

    Role in the project: Leads the Community of RAA Permitting and Implementation.

    Visit Ecorys Brussels

    Ecorys is one of Europe’s leading public policy consultancies, supporting EU institutions and Member States in the design and implementation of policies that accelerate the clean energy transition. Ecorys has built a strong track record in renewable energy deployment, with particular expertise in permitting reform, Renewable Acceleration Areas (RAAs), spatial planning, public participation, citizen energy, energy communities and the governance of energy transitions.

    Read more about Ecorys Brussels

    Through major European initiatives, including RE-Siting, the Citizen Energy Advisory Hub (CEAH) for the European Commission, and multiple technical assistance and capacity-building programmes for national and regional authorities, Ecorys has helped bridge the gap between policy ambition and practical implementation. Ecorys recently produced for the European Commission a study on good practices in siting renewable energy installations, taking into account the interactions with other public goods.

    Its multidisciplinary teams combine energy policy, environmental assessment, regional development, stakeholder engagement and socio-economic analysis to support authorities in delivering renewable energy projects more efficiently while maintaining high standards of transparency, environmental stewardship, community acceptance and local ownership. Drawing on extensive experience in renewable energy communities, policy research, citizen engagement and technical assistance, including through the European Energy Communities Facility (EECF) and the Rural Energy Community Advisory Hub (RECAH), Ecorys helps ensure that renewable energy deployment not only delivers on climate and energy objectives but also generates tangible benefits for citizens and local communities.

  • ICLEI Europe logo

    ICLEI European Secretariat

    Germany

    Role in the project: Connects the project to local governments and keeps key results accessible after the project ends.

    Visit ICLEI Europe

    ICLEI – Local Governments for Sustainability is the world’s leading network of local and regional governments committed to sustainable development. Its global network ensures that through joint action, peer learning, and strong partnerships between civil society, business leaders and all levels of government, local sustainable development accelerates and makes real change on the ground.

    Read more about ICLEI Europe

    Since 1992 the ICLEI European Secretariat has been working closely with ICLEI network cities in Europe, the Middle East and West Asia, other European networks, the European Commission, the Committee of the Regions and many others. It works with over 180 in-house sustainability and communications professionals from its offices in Freiburg (DE), Berlin (DE) and Brussels (BE).

    ICLEI Europe coordinates the Fast & Fair Renewables & Grids Initiative: Europe’s first cross-sector agreement on five baseline principles for fairness in renewable energy. A fast and fair energy transition is built on more effective and accelerated permitting procedures, and that is why ICLEI works on RAA-PERMIT-BOOST to make this a reality.

  • Civitta logo

    CIVITTA

    Lithuania

    Role in the project: Contributes to the EU-27 analysis and country-level research.

    Visit Civitta

    Civitta provides consulting, digital and funding solutions in over 20 countries. Founded in 2013 in the Baltic states, it has since expanded across Central and Eastern Europe, the Nordics and Central Asia. Civitta combines international experience with a deep understanding of local market specifics. Its energy and infrastructure practice advises public and private clients on policy and strategy, investment planning and delivery, and the green transition.

    Good renewable energy planning keeps the energy transition moving.

    Valts Ulmanis, Civitta

RAA map

How each Member State designates and runs Renewable Acceleration Areas, and the European rules behind them.

Select a country on the map or in the list to open its summary.

Italy France Spain Sweden Finland Greece Germany Poland Romania Croatia Portugal Bulgaria Hungary Austria Denmark Czechia Ireland Latvia Lithuania Slovakia Netherlands Estonia Belgium Slovenia Cyprus Luxembourg Malta
  • EU Member State, analysed
  • Selected
  • Outside the EU, for orientation

Outermost regions are not shown. Administrative boundaries: © EuroGeographics. Regional detail will be added as the analysis progresses.

All 27 Member States

The project covers every EU Member State. Search by country or region name (in English, German or the national language) or by a term in the country profiles.

27 countries

No country matches your search.

The European rules that decide where Renewable Acceleration Areas can be designated and how projects inside them are permitted. Select a legal text to see what it does, how it connects to the others and where to read it.

  • Selected
  • Directly connected

Renewable Energy Directive (RED III)

Environmental assessment

Nature and water protection

Context and guidance

RED III

Directive (EU) 2023/2413

What it does

Amends the Renewable Energy Directive, raises the EU 2030 renewables target to at least 42.5% and introduces mapping, Renewable Acceleration Areas and faster permitting.

Why it matters for RAAs

The legal basis for Renewable Acceleration Areas.

Connected to

Read on EUR-Lex

Art. 15b: Mapping of areas

RED III

What it does

Member States map the land, sea and inland water areas needed to install the renewable capacity for their national 2030 contribution.

Why it matters for RAAs

The mapping is the starting point for designating Renewable Acceleration Areas.

Connected to

Learn more

  • Energy and Industry Geography Lab (JRC)
  • Commission guidance on designating renewables acceleration areas
Read on EUR-Lex

Art. 15c: Renewable Acceleration Areas

RED III

What it does

Member States adopt plans that designate Renewable Acceleration Areas for one or more types of renewable energy where significant environmental impacts are not expected, and set rules on mitigation measures.

Why it matters for RAAs

The core provision. Natura 2000 sites, national nature protection areas and major bird and marine mammal migration routes are generally excluded. The plans undergo a strategic environmental assessment.

Connected to

Learn more

  • Commission guidance on designating renewables acceleration areas
Read on EUR-Lex

Art. 15d: Public participation

RED III

What it does

Requires public participation in the plans that designate Renewable Acceleration Areas.

Why it matters for RAAs

Early participation supports acceptance of the areas and of the projects built in them.

Connected to

Read on EUR-Lex

Art. 15e: Grid and storage areas

RED III

What it does

Allows Member States to designate dedicated infrastructure areas for grid and storage projects needed to integrate renewables.

Why it matters for RAAs

Complements Renewable Acceleration Areas so that generation and grid capacity grow together.

Connected to

Read on EUR-Lex

Art. 16a: Permitting in RAAs

RED III

What it does

Sets shorter maximum durations for permit-granting inside Renewable Acceleration Areas and replaces the full environmental impact assessment with a screening for projects that follow the plan’s rules.

Why it matters for RAAs

Turns designation into faster permits.

Connected to

Learn more

  • European Commission: enabling framework for renewables
Read on EUR-Lex

Art. 16f: Overriding public interest

RED III

What it does

Renewable energy plants, their grid connection and storage are presumed to be in the overriding public interest when legal interests are balanced in individual cases.

Why it matters for RAAs

Relevant for derogations under nature and water protection law.

Connected to

Read on EUR-Lex

EIA Directive

Directive 2011/92/EU

What it does

Requires an environmental impact assessment for projects likely to have significant effects on the environment. Amended by Directive 2014/52/EU.

Why it matters for RAAs

Inside Renewable Acceleration Areas, projects that follow the plan’s rules are exempt from a full assessment under Article 16a RED III.

Connected to

Read on EUR-Lex

SEA Directive

Directive 2001/42/EC

What it does

Requires a strategic environmental assessment of certain plans and programmes, including public consultation.

Why it matters for RAAs

Plans designating Renewable Acceleration Areas are assessed under this directive.

Connected to

Read on EUR-Lex

Habitats Directive

Directive 92/43/EEC

What it does

Protects natural habitats and species and, together with the Birds Directive, establishes the Natura 2000 network.

Why it matters for RAAs

Natura 2000 sites are generally excluded from Renewable Acceleration Areas; plans may need an appropriate assessment.

Connected to

Read on EUR-Lex

Birds Directive

Directive 2009/147/EC

What it does

Protects all wild bird species and requires special protection areas.

Why it matters for RAAs

Special protection areas and major bird migration routes are generally excluded from Renewable Acceleration Areas.

Connected to

Read on EUR-Lex

Water Framework Directive

Directive 2000/60/EC

What it does

Sets the framework for protecting and restoring rivers, lakes, coastal waters and groundwater.

Why it matters for RAAs

Relevant for hydropower and for exemptions where the overriding public interest applies.

Connected to

Read on EUR-Lex

RED II

Directive (EU) 2018/2001

What it does

The recast Renewable Energy Directive that RED III amends.

Why it matters for RAAs

Read RED III together with the consolidated version of this directive.

Connected to

Read on EUR-Lex

Emergency Regulation

Regulation (EU) 2022/2577

What it does

A temporary framework adopted in 2022 to accelerate permitting during the energy crisis.

Why it matters for RAAs

Several of its measures, including the overriding public interest presumption, were made permanent in RED III.

Connected to

Read on EUR-Lex

Permitting Recommendation

Recommendation (EU) 2024/1343

What it does

Commission recommendation on speeding up permit-granting procedures for renewable energy and related infrastructure projects.

Why it matters for RAAs

Practical guidance for authorities implementing Renewable Acceleration Areas and faster permitting.

Connected to

Learn more

  • European Commission: enabling framework for renewables
Read on EUR-Lex

National transposition

Laws of the Member States

What it does

Each Member State transposes RED III into national law and, where relevant, regional law.

Why it matters for RAAs

Country summaries are collected on the country map.

Connected to

Open the country map

Summaries are simplified. Only the texts published in the Official Journal of the EU are legally binding.

Country

Suggest information or a correction

Library

All public deliverables of the project as set out in the Grant Agreement. Everything is free to use. Deliverables not yet published are listed with their planned date.

  • ReportD2.1

    Concept note

    The analytical approach for monitoring how Member States implement RAAs.

    Lead: eclareon

    Coming soon
  • ReportD6.1

    Communication, dissemination and exploitation plan

    Target groups, channels and how results will be used after the project.

    Lead: EREF

    Coming soon
  • ReportD5.1

    Community of Practice KPI framework

    How the success of the two Communities of Practice is measured.

    Lead: TNC

    Coming soon
  • ReportD1.2

    Data management plan

    How the project collects, protects and shares data, and applies the FAIR principles.

    Lead: Th!nk E

    Coming soon
  • DataD2.2

    Living repository of EU-27 and regional analysis

    Database on how Member States and regions implement RED III Articles 15b and 15c. Shown on the RAA map.

    Lead: eclareon

    Open the RAA map
  • ReportD3.1

    Framework on practical approaches

    The framework for selecting and analysing the case studies.

    Lead: Ecorys España

    Planned for November 2026
  • ReportD5.2

    Playbook: Community of RAA Siting and Designation

    How the community works, who takes part and how to join.

    Lead: TNC

    Planned for November 2026
  • ReportD4.1

    Clerk’s Manual for efficient permitting

    Step-by-step handbook for municipal clerks, planners and permitting officers.

    Lead: AEA

    Planned for January 2027
  • ReportD5.3

    Playbook: Community of RAA Permitting and Implementation

    How the community works, who takes part and how to join.

    Lead: TNC

    Planned for January 2027
  • ReportD5.4

    Best-practice validation criteria for RAA siting and designation

    Criteria to assess good practice in siting and designating RAAs.

    Lead: TNC

    Planned for January 2027
  • ReportD2.4

    List of pioneers and learners in key areas

    Which Member States lead on which RAA topics, and who can learn from whom.

    Lead: eclareon

    Planned for March 2027
  • ReportD4.5

    Targeted technical assistance: call and selection note

    Criteria, shortlist and work plans of the technical assistance programme.

    Lead: Th!nk E

    Planned for March 2027
  • ReportD3.2

    Case studies on RAA zoning and permitting

    25 to 30 case studies from across the EU.

    Lead: Ecorys España

    Planned for May 2027
  • ReportD3.3

    In-depth comparative analysis and synthesis

    What the case studies show across countries and technologies.

    Lead: Ecorys España

    Planned for July 2027
  • PresentationD4.2

    Regularly updated presentation of project progress and findings

    Slides updated every three months with input from the helpdesk and the communities.

    Lead: AEA

    Planned for August 2027
  • ReportD6.6

    EU policy conference report

    Results and discussions of the first EU policy conference.

    Lead: EREF

    Planned for September 2027
  • ReportD6.9

    Report on the briefing workshop for European stakeholders

    Results of the briefing workshop.

    Lead: EUFORES

    Planned for September 2027
  • ReportD2.5

    Final report of the EU-27 analysis

    The findings across all 27 Member States in one document.

    Lead: eclareon

    Planned for November 2027
  • WebinarD4.3

    Webinar package

    Recordings and material from the webinars on the Clerk’s Manual.

    Lead: AEA

    Planned for November 2027
  • ReportD4.8

    Targeted technical assistance report

    Results of the targeted technical assistance for authorities.

    Lead: Th!nk E

    Planned for November 2027
  • ReportD5.5

    Technical handbook for RAA siting and designation

    Methods for spatial mapping, siting and RAA designation.

    Lead: TNC

    Planned for November 2027
  • ToolD4.6

    Self-assessment tool for authorities

    Excel tool with user note: check your readiness for RED III Articles 15b and 15c.

    Lead: Th!nk E

    Planned for March 2028
  • ToolD4.7

    NGO KPI toolkit and pilots report

    Indicators to monitor biodiversity safeguards and community engagement in RAAs, tested by five NGOs.

    Lead: Th!nk E

    Planned for March 2028
  • ReportD4.4

    Helpdesk and clinics: final report

    What authorities asked and what helped, including a summary of the one-to-one consultations.

    Lead: AEA

    Planned for May 2028
  • PodcastD6.5

    RAA-PERMIT-BOOST podcast series

    10 to 15 short episodes on RAAs, zoning and permitting.

    Lead: AEA

    Planned for May 2028
  • ReportD6.2

    Communication material report

    Overview of the project’s communication material.

    Lead: EREF

    Planned for August 2028
  • ReportD6.3

    FAQs for administrative staff in public authorities

    20 to 25 technical questions and answers, published on this website.

    Lead: AEA

    Go to the FAQs
  • ReportD6.4

    FAQs for the general public

    20 to 25 questions and answers in plain language, published on this website.

    Lead: AEA

    Go to the FAQs
  • ReportD6.7

    Second EU policy conference report

    Results of the final EU policy conference.

    Lead: EREF

    Planned for August 2028
  • ReportD6.8

    Compilation of five national parliamentary workshop reports

    Results of the workshops with national parliamentarians.

    Lead: EUFORES

    Planned for August 2028
  • ReportD6.10

    Policy recommendations

    Recommendations on scaling and improving RAAs under Article 15.

    Lead: EREF

    Planned for August 2028

Nothing matches this search.

Support and FAQ

Free support for authorities and practitioners working on Renewable Acceleration Areas, and plain answers for everyone else.

Get support

Helpdesk and clinics

Opens March 2027

Ask a question about designation or permitting and get an answer from a subject expert. We offer up to 100 one-hour one-to-one consultations and thematic clinics, for example on SEA and EIA alignment, digital dossiers or GIS data.

Until the helpdesk opens, send your question through the contact form with the topic “Helpdesk and clinics”. Every request gets a reference number.

Send a helpdesk question

Targeted technical assistance

Call opens February 2027

For authorities facing complex issues that need process redesign: a team of project experts works with you step by step. Call documents, eligibility and selection criteria and the application form will be published here.

Ask to be informed when the call opens

Webinars

From 2027

Three webinars present the Clerk’s Manual for efficient permitting and the project’s findings, with the option to book a one-to-one consultation afterwards. Recordings will be in the library.

Go to the library

Self-assessment tool

Planned for March 2028

Answer multiple-choice questions on your RAA planning and permitting under RED III Articles 15b and 15c. Where you score low, the tool suggests examples and solutions from similar Member States.

See all tools

Frequently asked questions

The basics of Renewable Acceleration Areas in plain language.

What is a Renewable Acceleration Area?

An area a Member State has designated in a plan as particularly suitable for one or more types of renewable energy, where projects are not expected to have significant environmental impacts. Projects inside these areas benefit from simpler and faster permitting.

Learn more

  • Commission guidance on designating renewables acceleration areas
Why does the EU want Renewable Acceleration Areas?

To reach at least 42.5% renewable energy by 2030, Europe needs to build faster. Settling environmental questions once, at planning stage, means individual projects do not each have to start from scratch.

Learn more

  • European Commission: enabling framework for renewables
Is nature protected in Renewable Acceleration Areas?

Natura 2000 sites, national nature protection areas and major bird and marine mammal migration routes are generally excluded. The plans that designate the areas undergo an environmental assessment, and projects must apply the mitigation measures the plan sets.

Learn more

  • Commission guidance on designating renewables acceleration areas
Can I have a say?

Yes. Member States must involve the public when they prepare the plans that designate Renewable Acceleration Areas. Your national or regional authority announces these consultations.

Who decides where Renewable Acceleration Areas are?

National, regional or local authorities, depending on the Member State. The RAA map shows the situation in each country as our analysis progresses.

Technical questions from authorities. Answers are published from March 2027, based on helpdesk requests and the Communities of Practice.

How can the SEA of an RAA plan be combined with an appropriate assessment under the Habitats Directive?

The answer will be published from March 2027. Until then, see:

Learn more

  • Commission guidance on designating renewables acceleration areas
Which mitigation rules must a project follow to get a screening instead of a full EIA?

The answer will be published from March 2027. Until then, see:

Learn more

  • Commission guidance on designating renewables acceleration areas
Which permitting deadlines apply inside and outside Renewable Acceleration Areas?

The answer will be published from March 2027. Until then, see:

Learn more

  • European Commission: enabling framework for renewables
How should spatial data for RAA designation be documented and shared?

The answer will be published from March 2027. Until then, see:

Learn more

  • Energy and Industry Geography Lab (JRC)
  • Commission guidance on designating renewables acceleration areas

Question not answered? Ask us

Key EU resources

Official sources from the European Commission that we refer to throughout this website.

  • For everyone

    Commission guidance on designating renewables acceleration areas

    The European Commission’s guidance on how Member States can designate Renewable Acceleration Areas under RED III. Published in May 2024, available in all EU languages.

  • For everyone

    European Commission: enabling framework for renewables

    The Commission’s overview of faster permitting for renewables: legislation, guidance and the permitting recommendation in one place.

  • For planners and GIS experts

    Energy and Industry Geography Lab (JRC)

    Interactive maps by the Commission’s Joint Research Centre with spatial data on energy infrastructure, industry and renewable energy.

Contact

Questions about Renewable Acceleration Areas, the project or our support services? Write to us. The consortium answers every enquiry.

Fields marked * are required. The button prepares an email in English in your own email program. Nothing is sent from this website.

Data protection information

The button only prepares an email in your own email program; this website does not send or store your details. When you send the email, the Austrian Energy Agency (controller) receives your name, organisation, email address and message to answer your enquiry (legitimate interest, Art. 6(1)(f) GDPR) and may share it with the project partner best placed to help. Details, retention and your rights: data protection notice. Data protection officer: datenschutz(at)energyagency.at.

Your email program should now open with the prepared message. Check it and press send.

Nothing happened? Copy the text below and send it to erneuerbare(at)energyagency.at.

Copied.

Who reads your message

Enquiries go to the Austrian Energy Agency, which coordinates the answers and passes questions to the right expert in the consortium.

Prefer to write directly?

erneuerbare(at)energyagency.at

Project coordinator

Th!nk E BV
c/o Diestsevest 32/6b
3000 Leuven, Belgium

Imprint

Media owner and publisher

Österreichische Energieagentur – Austrian Energy Agency (AEA)
Mariahilfer Straße 136
1150 Vienna
Austria

Phone: +43 (0)1 586 15 24-0
Email: office(at)energyagency.at
Website: www.energyagency.at

Registered association, ZVR number: 914305190
VAT ID: ATU 36817502

Information on the governing bodies and the statutes of the Austrian Energy Agency.

Questions about the project: contact form or erneuerbare(at)energyagency.at

Project

RAA-PERMIT-BOOST – Boosting Renewable Energy Acceleration Implementation.
Project coordinator: Th!nk E BV, c/o Diestsevest 32/6b, 3000 Leuven, Belgium.

Purpose of this website: information on the RAA-PERMIT-BOOST project, its results and its support services on Renewable Acceleration Areas and permitting.

Funding and EU disclaimer

RAA-PERMIT-BOOST has received funding from the European Union’s LIFE programme under grant agreement No 101294471 (LIFE25-CET-RAA-PERMIT-BOOST). Views and opinions expressed are however those of the author(s) only and do not necessarily reflect those of the European Union or CINEA. Neither the European Union nor the granting authority can be held responsible for them.

Copyright

© Österreichische Energieagentur and the RAA-PERMIT-BOOST consortium partners.

Unless stated otherwise, the content of this website may be used for non-commercial purposes, provided the source is cited. Any changes, additions or deviations must be marked as your own content. Prior permission from the Austrian Energy Agency is required for reusing larger amounts of content, also for non-commercial purposes.

Embedding content of this website in frames of other websites is not permitted without express consent. Links to this website are always welcome.

For embedded text and multimedia content (sound, images, software and so on), prior permission of the copyright owner may be required; any restrictions of use are clearly indicated. Partner logos are the property of the respective organisations. If you are unsure whether your use complies with these rules, please contact office(at)energyagency.at.

Disclaimer

The Austrian Energy Agency accepts no liability for the content or for the uninterrupted and error-free operation of this website. Errors, omissions, changes and maintenance of the website cannot be ruled out. We accept no responsibility for the content of linked websites or for any third-party comments.

None of the content constitutes official communication by a public authority. This website offers general information only. We do not provide professional or legal advice.

Our goal is to provide accurate and up-to-date information. If you notice errors, or find content on linked websites that is illegal, racist, sexist, discriminatory, pornographic, National Socialist or offensive, please let us know at office(at)energyagency.at.

Data protection

We respect the privacy of our users. For details, see our data protection notice.

Credits

Map boundaries: © EuroGeographics for the administrative boundaries. Typeface: Jost, SIL Open Font License.

Data protection

We process personal data only as far as necessary to run this website, to answer your requests and to carry out the RAA-PERMIT-BOOST project, in line with the General Data Protection Regulation (Regulation (EU) 2016/679, GDPR), the Austrian Data Protection Act and Article 15 of the project’s Grant Agreement. How the project handles data in general is set out in its Data Management Plan (deliverable D1.2), which will be published in the library.

Who is responsible

Controller for this website and the contact form:
Österreichische Energieagentur – Austrian Energy Agency (AEA), Mariahilfer Straße 136, 1150 Vienna, Austria
Email: erneuerbare(at)energyagency.at
Data protection officer of the AEA: the external data protection officer Dr. Sonja Hebenstreit, attorney at law, Herbst Kinsky Rechtsanwälte, 1010 Vienna, Austria, datenschutz(at)energyagency.at

Each project partner is the controller for the personal data it collects directly in its own project activities, for example interviews, national stakeholder groups, webinars, clinics or Community of Practice meetings. Before such an activity you receive a data protection statement naming the responsible partner and a contact person.

Data protection contact of the RAA-PERMIT-BOOST project: Jan Bormans, Th!nk E, jan(at)think-e.be

Visiting the website

This website is hosted by Cloudflare, Inc. (Cloudflare Pages). When you visit it, Cloudflare processes technical data such as your IP address, date and time, the page requested and your browser type, to deliver the pages and protect them against attacks (legitimate interest, Art. 6(1)(f) GDPR). Cloudflare may process data outside the European Economic Area; it is certified under the EU-US Data Privacy Framework. We do not store server log files ourselves. Cloudflare processes this technical data only as long as necessary to deliver the website and protect it against attacks, in line with Cloudflare’s privacy policy.

This website does not use cookies and does not load fonts or scripts from other providers.

Contacting us and helpdesk requests

The contact form on this website does not send or store any data. When you click the button, the website prepares an email with the details you entered (name, organisation, type of organisation, country, topic and message) and opens it in your own email program. Only when you send that email do we receive it, at erneuerbare(at)energyagency.at, together with your email address. The prepared email contains a short confirmation that you have read this notice, which we keep as a record.

We process your email to answer your request and, where relevant, to provide helpdesk and clinic support. As you contact us in connection with the project, typically in a professional capacity, the legal basis is our legitimate interest in carrying out the action funded under the Grant Agreement (Art. 6(1)(f) GDPR). Your email is stored in the project’s Microsoft 365 environment, hosted in the EU, and shared with the consortium partner best placed to answer only where this is necessary. Helpdesk requests are pseudonymised before they are summarised in the project’s public helpdesk report (D4.4).

Please do not send special categories of personal data (for example on health, political opinions or religious beliefs).

Names, quotes, photos and recordings

Contributions to the project are normally attributed to an organisation, not to a person. We only publish a quote with a person’s name, a photograph or video in which someone is identifiable, or a webinar recording showing participants, with the explicit consent of the person concerned (Art. 6(1)(a) GDPR). Anyone quoted is offered the chance to review the text before publication, and can withdraw their consent at any time.

Videos on YouTube

Videos are only loaded from YouTube (Google Ireland Ltd.) after you click “Play video”. Only then is your IP address transferred to YouTube. We use the privacy-enhanced mode (youtube-nocookie.com). The legal basis is your consent by clicking (Art. 6(1)(a) GDPR). YouTube may transfer data to the USA; Google is certified under the EU-US Data Privacy Framework.

Links to LinkedIn and other services

Links to LinkedIn and partner websites are plain links. No data is transferred to these services unless you click a link; their own data protection rules then apply.

Web analytics

To report the project’s communication indicators to the European Union, for example page views, downloads and video views, we use GoatCounter, an open-source analytics service (goatcounter.com). GoatCounter does not use cookies, does not store your IP address and does not track you across websites. It records the page visited, the referring website, browser and operating system, screen size and the country derived from the IP address, and counts repeat visits using a short-lived, non-identifiable hash. We also count, without any personal data, when a document is downloaded, a video is started, a country is opened on the map or a form is submitted.

We only see aggregated statistics. The legal basis is our legitimate interest in measuring the reach of the publicly funded project (Art. 6(1)(f) GDPR). GoatCounter is operated by Martin Tournoij, Ireland. The data is stored on servers of Hetzner Online GmbH in Finland and Germany, so it does not leave the European Union. Statistics are only collected on www.raa-permit-boost.eu.

Who receives your data

Access is limited to project staff who need the data for their tasks and who are bound by confidentiality obligations. Within the consortium, data is shared only where necessary for the project. In aggregated or anonymised form it may be shared with the funding agency, the European Climate, Infrastructure and Environment Executive Agency (CINEA), for reporting. Audit bodies such as CINEA or the European Court of Auditors may access data in the context of an audit. Your data is not passed on to any other third party unless we are legally required to do so. It is not used for automated decision-making or profiling.

Transfers outside the EU

Project data shared between partners is stored on Microsoft 365 services hosted in the EU. Some tools used for communication, such as website hosting, YouTube, LinkedIn and the podcast host, may transfer data outside the European Economic Area. Before a tool is used, the project checks that an adequacy decision, such as the EU-US Data Privacy Framework, or Standard Contractual Clauses cover the transfer.

How long we keep your data

We keep personal data only as long as necessary for the purpose for which it was collected. Contact and helpdesk requests are deleted once they have been answered and are no longer needed for the project, at the latest at the end of the project, unless they are needed as proof that the project was properly carried out. Such records are kept for five years after the final payment under the Grant Agreement, as required by the Grant Agreement.

Your rights

You have the right to access your personal data (Art. 15 GDPR), to have it corrected (Art. 16), and, under certain conditions, to have it erased (Art. 17), to restrict its processing (Art. 18), to receive it in a portable format (Art. 20) and to object to its processing (Art. 21). You may object at any time, on grounds relating to your particular situation, to processing based on legitimate interest. Where processing is based on your consent, you can withdraw it at any time; this does not affect the lawfulness of processing carried out before.

To exercise your rights, write to erneuerbare(at)energyagency.at, to the AEA’s data protection officer at datenschutz(at)energyagency.at or to the project’s data protection contact. We answer within one month; where necessary, this period can be extended by two further months, in which case we tell you why.

You also have the right to lodge a complaint with a data protection supervisory authority. In Austria this is the Datenschutzbehörde (www.dsb.gv.at). A list of all national authorities is available from the European Data Protection Board.

Last updated: 22 October 2026

Accessibility statement

The Austrian Energy Agency is committed to making this website accessible in accordance with the Austrian Web Accessibility Act (Web-Zugänglichkeits-Gesetz, WZG) as amended, which transposes Directive (EU) 2016/2102 of the European Parliament and of the Council of 26 October 2016 on the accessibility of the websites and mobile applications of public sector bodies (OJ L 327, 2.12.2016, p. 1).

This accessibility statement applies to the website www.raa-permit-boost.eu.

Compliance status

This website is partially compliant with the Web Content Accessibility Guidelines (WCAG) 2.1, level AA, because of the exceptions listed below. In our tests, the web pages themselves showed no violations.

Non-accessible content

  • PDF documents: The project leaflet (PDF) is not yet fully accessible: it has no tagged structure, so screen readers may read it in the wrong order. The same information is available on the About page. We will replace the file with an accessible version.
  • Third-party content: Videos are hosted on YouTube. We aim to publish all videos with subtitles; the accessibility of the YouTube player itself is outside our control. Linked websites of partners and other organisations are not covered by this statement.

The interactive map can be used with a keyboard. All Member States are also available as a text list next to the map, and the legal map shows all information as text.

Preparation of this accessibility statement

This statement was prepared on 22 October 2026. It is based on a self-assessment: an automated test of all pages against WCAG 2.1 A and AA (axe-core) on desktop and mobile, and manual checks of keyboard operation, visible focus, the skip link, the map window, colour contrast, text enlargement to 200 % and display on narrow screens down to 320 pixels.

Feedback and contact information

The content and services on this website are continuously improved and extended. Usability and accessibility are important to us.

If you notice barriers that prevent you from using our website, please let us know by email. We will review your request and contact you as soon as possible.

Please send all messages and suggestions to erneuerbare(at)energyagency.at with the subject “Report of a barrier on www.raa-permit-boost.eu”, or use the contact form. Please describe the problem and give the address (URL) of the page concerned.

Enforcement procedure

If you are not satisfied with the answer you receive through the contact options above, you can file a complaint with the Austrian Research Promotion Agency (Österreichische Forschungsförderungsgesellschaft mbH, FFG). The FFG accepts complaints electronically through its complaint form.

The FFG checks whether a complaint concerns a breach of the Web Accessibility Act, in particular shortcomings in meeting the accessibility requirements, by the federal government or a body attributable to it. If the complaint is justified, the FFG issues recommendations and proposes measures to remedy the shortcomings.

More information on the complaint procedure (in German)

RAA-PERMIT-BOOST

Boosting Renewable Energy Acceleration Implementation

Th!nk E, project coordinator

Project coordinator: Th!nk E BV
c/o Diestsevest 32/6b, 3000 Leuven, Belgium
T. +32 479 29 33 17 | M. contactform(at)think-e.be
www.think-e.be

Co-funded by

Co-funded by the European Union, LIFE programme

Co-funded by the European Union. Views and opinions expressed are however those of the author(s) only and do not necessarily reflect those of the European Union or CINEA. Neither the European Union nor the granting authority can be held responsible for them. RAA-PERMIT-BOOST has received funding from the European Union’s LIFE programme under grant agreement No 101294471 (LIFE25-CET-RAA-PERMIT-BOOST).

© 2026, Österreichische Energieagentur
  • Imprint
  • Data protection
  • Accessibility statement